<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:cc="http://cyber.law.harvard.edu/rss/creativeCommonsRssModule.html">
    <channel>
        <title><![CDATA[Stories by Dev Amratia on Medium]]></title>
        <description><![CDATA[Stories by Dev Amratia on Medium]]></description>
        <link>https://medium.com/@dev.amratia?source=rss-eb2e897e9aae------2</link>
        <image>
            <url>https://cdn-images-1.medium.com/fit/c/150/150/1*EzaME1r-oz6vyaNobDKg0Q.jpeg</url>
            <title>Stories by Dev Amratia on Medium</title>
            <link>https://medium.com/@dev.amratia?source=rss-eb2e897e9aae------2</link>
        </image>
        <generator>Medium</generator>
        <lastBuildDate>Sat, 21 Nov 2026 04:26:57 GMT</lastBuildDate>
        <atom:link href="https://medium.com/@dev.amratia/feed" rel="self" type="application/rss+xml"/>
        <webMaster><![CDATA[yourfriends@medium.com]]></webMaster>
        <atom:link href="http://medium.superfeedr.com" rel="hub"/>
        <item>
            <title><![CDATA[I’m a project manager — given the chance, here’s how I would have used AI]]></title>
            <link>https://medium.com/@dev.amratia/im-a-project-manager-given-the-chance-here-s-how-i-would-have-used-ai-b2fdd1c71da7?source=rss-eb2e897e9aae------2</link>
            <guid isPermaLink="false">https://medium.com/p/b2fdd1c71da7</guid>
            <dc:creator><![CDATA[Dev Amratia]]></dc:creator>
            <pubDate>Fri, 04 Aug 2023 14:05:01 GMT</pubDate>
            <atom:updated>2023-08-04T14:05:01.611Z</atom:updated>
            <content:encoded><![CDATA[<h3>I’m a project manager — given the chance, here’s how I would have used AI</h3><p>Ok, technically I’m no longer a project manager, but after 9 years in the trade on 3 continents, I still recall the challenges of the role like it was yesterday. This blog is written as a retrospective of how I would have run my projects if I had the type of technology available today. The second part of this article will be written by my friend and colleague Toby Buchanan, for his views on how he would have used AI as a PM at a Contractor.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*omrnNPHeFZHQwRXpXgK_2w.jpeg" /><figcaption>Standing inside a compressor casing during a facility turnaround project (circa 2010)</figcaption></figure><p>For background, I was a mechanical engineer, turned project engineer, and turned project manager during my tenure with Shell. I had the privilege to work on projects such as Pearl GTL, a facility that can produce liquid petroleum products from natural gas, at room temperature and pressure (a chemistry buff will point out this is supposed to be impossible to do). The projects I worked on were inspiring forms of engineering and translating that into a completed asset was a level of complexity beyond us. Unfortunately, none of the projects I worked on were delivered on time or budget and as project manager, the failure was on me, irrespective of the cause.</p><p>I’ll start the retrospective with what I’d do differently (if ever given a chance) with projects in the early concept phase and finish with projects in execution.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*wT9XUFO8bjZ5ZKmal5TXLg.png" /></figure><p>During concept selection, we are carrying large amounts of uncertainty about the project and choices on scope need to be made with limited information. For example, my team needed to pick whether the optimal strategy was to build redundancy into the design for future debottlenecking or to build the initial scope lean and make provisions for a second project phase. Deciding between the two options required us to hold data on the time and cost implications of each, something we didn’t have beyond the rules of thumb or heuristics. It was nearly impossible for us to compare our options side-by-side and to make the problem harder, we had hundreds of options we needed to evaluate and make decisions on. Given the chance, I’d use AI to analyse my schedule options for cost and risk — AI would find out how other projects performed when they selected a particular option — this would have been gold dust to me, dramatically accelerating the speed of option selection but more importantly, improving the decision quality during option selection.</p><p>During detailed design we were either in a competitive FEED (Front End Engineering &amp; Design) or single award and the common challenge was in understanding our risks on the project and whether we were building a handle for it. On the projects I worked on, we spent countless hours talking about what we felt our risks were and what we could do about them. I remember chairing a meeting to discuss the risk of our site logistics constraining craft productivity. The crazy thing about this meeting was that none of us knew the extent (impact) of the risk, or even whether the risk was real. We didn’t have data on how projects of our size or location performed and whether they experienced issues with site logistics. We were spending hours discussing risks based on the limited experience we had as a project team. Given the chance, I’d use AI to analyse my schedule to show me where risk might materialise. I’d cancel the lengthy and expensive QSRA workshops we run and opt for an “action planning” session instead, so we can focus on finding ways to mitigate the negative effects of risk that are objectively shown to us.</p><p>The other part of detailed design is negotiation with your contractors, as we set ourselves up for the execution of the project. I’ve sat on the negotiating table armed with an intuition that the contractor is bluffing about how long a sequence of activities will take. I was so sure I could smell bullshit but I also had nothing to help me call it out in specific terms — I tried to do it with generic sweeping statements but learnt very quickly that is a very ineffective mechanism to reach an agreement on scope, cost and schedule. “I think you can deliver this project faster” simply had no bite. The worst outcome was when there were adjustments to the final cost or schedule based on the pressure exerted — in all cases, these cost savings were eroded during execution. Given the chance, I’d use AI to provide a specific critique of the proposed schedule from the contractor and if there were more than one, I’d use it to provide a contrast on the contractors’ proposed schedules. Data would become the equaliser in the generally adversarial contract negotiation process. I’d use data to help me figure out where in the massive project I need to look and allows me to ask very targeted questions during the review period, such as “The data shows you have a significant risk around the execution of electrical works, what mitigations or controls do you have in place for that?” In all of this, my hope is we’ve got the correct baseline, we’ve aligned expectations (both upwards and downwards) and that I sign an agreement that gives both the contractor and me the best chance of delivering the project on time and within budget, which also means the contractor takes their target margin or better.</p><p>“The plan is only good until the first shovel hits the ground” — a saying I’ve heard several times as we begin execution of the main works of the project. It pays homage to the incredible amount of uncertainty still present when we begin building, post-sanction. Given the uncertainty, unplanned change is inevitable. A turbine fails catastrophically during its Factory Acceptance Test, an unseasonable hurricane hits our site, and the pipe welders just could not weld fast enough — these are just the three things I can remember that has happened to me on the few projects I’ve seen. On each occasion, my team and I responded gallantly. We immediately pulled together a crisis team, we were quick yet thorough in understanding what was going wrong and we put corrective actions in place to try to bring us back to the originally promised end date. Perhaps needless to say, despite all our work, we still weren’t able to deliver these projects on time or budget. Steve Corbin, the Project Director of LNG Canada once said “Our role as the owner team PMs is to ensure the project is mitigating risk at the appropriate rate” — the phrase makes perfect sense but how do we know what risk remains on our projects? Given a chance, I’d use AI to help identify where in the project a blowout might occur, well in advance. Had I known the assumptions we made around welding productivity were wrong, I’d have resourced the work correctly but because I didn’t, I paid a hefty premium to <em>try to resource</em> it correctly at the last minute — which didn’t work out because specialist welders weren’t freely available.</p><p>In summary, there are considerable opportunities available for project managers to use AI to improve their effectiveness. Many of the big challenges I personally faced are now solvable with AI and it still blows my mind that this is no longer science fiction, thanks to the incredible research, engineering and product team at nPlan.</p><p>If any of the use cases feel similar to a challenge you’re facing, drop me a message and I’ll happily work through how you can easily implement an AI solution.</p><p>P.s. — ChatGPT did not contribute to the article.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b2fdd1c71da7" width="1" height="1" alt="">]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[How data from past projects can help us through COVID-19]]></title>
            <link>https://medium.com/nplan/how-data-from-past-projects-can-help-us-through-covid-19-89879bed0796?source=rss-eb2e897e9aae------2</link>
            <guid isPermaLink="false">https://medium.com/p/89879bed0796</guid>
            <category><![CDATA[construction-project]]></category>
            <category><![CDATA[data]]></category>
            <category><![CDATA[black-swan]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[project-delays]]></category>
            <dc:creator><![CDATA[Dev Amratia]]></dc:creator>
            <pubDate>Tue, 05 May 2020 10:26:18 GMT</pubDate>
            <atom:updated>2020-05-05T10:29:54.738Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*QP8QschHM4gJE9NkRJn_PA.png" /></figure><p>Let’s start by accepting the part about how COVID-19 is unprecedented in its impact, and to most, it is a Black Swan*. To read more about Black Swan events, check out my co-founder Alan’s blog post <a href="https://medium.com/nplan/on-the-effect-of-black-swans-on-projects-532c887bfe04">here</a>. This article is designed to share thoughts on how best to think about reducing the system-wide impacts of COVID-19 on construction projects, the tools and methods we have at our disposal and how best to utilise them.</p><blockquote>“I was late on my last 3 projects but this project will be different” — anonymous Project Manager</blockquote><p>Given that delays are frequent, unforeseen and can often be of catastrophic consequence, there needs to be some conclusion drawn that, in fact, Black Swan’s do occur on projects. Here’s an example — Project A is a Greenfield power plant, connected by road to the remote project site. During the Project, the team is making excellent progress, with activities tracking as planned. A critical part of the plan is the installation of a gas turbine. Unfortunately, during transport the bridge on the primary road collapses under the turbine’s weight. Turbine + Water = Dead Turbine.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/504/0*gCDr7O8nZC3iAqn8" /><figcaption>Gas turbine found in the river Shetrumji, following a bridge collapse. Credit: Cargolaw</figcaption></figure><p>An event of this magnitude would have catastrophic consequences to the Project. Sourcing an alternative turbine can take many months and there will be chaos as the team scrambles to minimise the extent of damage to the Project. In hindsight, the team <em>should</em> have taken into account the low likelihood, high impact event of a bridge collapse — the frustrating beauty of hindsight! The team from Project A now have the data embedded in them to correctly estimate the likelihood and extent of a project delay due to a bridge collapse whilst a turbine is traversing it. In isolation, this data probably doesn’t feel very representative of the “average” project but if you consider that, in fact, <a href="https://digitalcommons.usu.edu/cgi/viewcontent.cgi?article=3187&amp;context=etd">128 bridges are expected</a> to collapse in the US annually, the chances that another construction project will suffer in a similar way to Project A is now considerable.</p><p>How is a bridge collapse similar to COVID-19’s impact? Both were deemed to be unlikely by project teams, both have significant consequences to project duration and both appear to have a way of being rationalised in hindsight. The difference is that COVID-19 affects all projects around the world and therefore takes a system-wide toll, as opposed to a local toll in the case of the bridge.</p><p>However, if you consider each project in isolation, similar to Project A, there is sufficient ground truth to say that past data on construction project performance contains Black Swan events, which can be used to estimate the likely impacts of the most topical Black Swan of modern time. If that wasn’t a jaw dropper, past data shows us how projects (irrespective of the cause) have handled impacts, giving us access to a wealth of knowledge and experience to guide us in these testing times.</p><p>Thinking of projects in isolation leaves the question of the system (or portfolio) that eventually makes up the balance sheet of most contractors. We’ve spent time at nPlan thinking about how best to spot the weak links or fragile projects in the portfolio, quite simply by comparing them against past data. If this were to scale up to a Government or National level, we’d be able to tell which projects are most likely to emerge a success and which are most likely to waste public money, think of it as a way of removing biases and leveraging data to guide over $1.2T in public money in wiser ways. Our friends at Harvard Business Review tend to agree <a href="https://hbr.org/2020/02/use-data-to-revolutionize-project-planning">here</a>.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/0*FH-pz3g-MFDsVjbd" /><figcaption>Me — standing inside a compressor chamber on a project I managed in the Netherlands</figcaption></figure><p>If there is one thing I can remember from my time managing projects with Shell, it is that not knowing where the project is headed is a deeply unsettling feeling. Using data from how past projects performed would have helped me many years ago and I hope that the work we’re doing at nPlan will help those who need it the most today.</p><p>*<em> The author of the Black Swan, Nassim Taleb, </em><a href="https://www.youtube.com/watch?v=Tb2pXXUSzmI&amp;amp=&amp;feature=youtu.be"><em>has argued that COVID-19 is a White Swan</em></a><em> — a predicted event of known consequence.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=89879bed0796" width="1" height="1" alt=""><hr><p><a href="https://medium.com/nplan/how-data-from-past-projects-can-help-us-through-covid-19-89879bed0796">How data from past projects can help us through COVID-19</a> was originally published in <a href="https://medium.com/nplan">nPlan</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[Business models in the construction industry are changing; here’s how]]></title>
            <link>https://medium.com/nplan/business-models-in-the-construction-industry-are-changing-heres-how-277b5ed05ca3?source=rss-eb2e897e9aae------2</link>
            <guid isPermaLink="false">https://medium.com/p/277b5ed05ca3</guid>
            <category><![CDATA[artificial-intelligence]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[intelligent-software]]></category>
            <category><![CDATA[business-models]]></category>
            <dc:creator><![CDATA[Dev Amratia]]></dc:creator>
            <pubDate>Sat, 09 Nov 2019 00:45:14 GMT</pubDate>
            <atom:updated>2019-11-09T02:41:39.533Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="On stage at DCW, classic nPlan background slide" src="https://cdn-images-1.medium.com/max/1024/1*O2afRbhv9GvNiXtVbFsQ7A.jpeg" /><figcaption>On stage at DCW, classic nPlan background slide</figcaption></figure><p>A few weeks ago, I got up on the main stage at Digital Construction Week to share my thoughts on the title of this blog. The audience that morning was full of construction professionals , half of whom thought I was crazy and the other half left having learnt something new. I had achieved my goal — to throw a cat amongst the pigeons, to catalyse discussion about the way we deliver projects today.. Here is what I shared:</p><p>The construction industry has been the same for a very long time, in some alarming ways. For one, projects consistently are unable to deliver to time or budget, which also means we’re not getting better at keeping promises. This long-standing statistic of failure has etched a lack of trust into stakeholders. We simply don’t believe one another when we think of project delivery, and this applies from building your home to building a nuclear power station.</p><p>To understand this in more detail, let’s start by taking a view of how construction projects come about and how they are then delivered. Construction projects originate by Clients (of construction) as concepts of public or private utility, from increasing passenger capacity on an overloaded rail line to building a Liquified Natural Gas plant to monetise a newly discovered gas field. The organisations that conceive these projects are seldom the ones to actually deliver them. During the evaluation phase of a project, Clients assess the business case of the investment and will ask Contractors to bid for the opportunity to perform the work. To understand this in more detail, let’s step into the perspective of the Client first, and then look at it from the Contractor’s viewpoint.</p><p><em>What are Clients looking for?</em></p><p>Clients are looking for the most economically feasible proposal, which is beyond who is cheapest and fastest on paper. They need to know and understand whether the bid they have received is <em>deliverable.</em> Clients are looking at tell tale symbols that show the proposal from the Contractor is flawed, which would therefore lead to inflation in the cost estimate and deflation in the business case. Clients need certainty, but how or where do they get this? Most often, it’s from the most experienced set of hands they can find internally or externally, with consultancies playing a role in augmenting knowledge and experience. More advanced projects will use benchmarking, such as that provided by <a href="https://www.ipaglobal.com/">IPA</a> (Independent Project Analysts LLC). Arguably, if these methods were sufficient, our long standing record of failures would have seen improvement.</p><p><em>What are Contractors looking for?</em></p><p>Contractors are looking to make a sustainable and predictable margin on the work they perform for Clients. It may sound like a low bar to cross for readers not native to the construction industry, but I promise you, this is a gargantuan change to achieve. When bidding on work, Contractors will make an assessment of the scope to be executed, balancing engineering effort with the risk of not winning the bid (these costs can sometimes be in the millions!). Should the Contractor realise that the scope to be delivered will probably take longer and/or cost more than what the Client is expecting, the Contractor has two choices: either inform the Client of the most realistic outcome of the project with the bid, or remain “competitive” in the bid, committing to the unrealistic expectations of the client. The risk in the former option is that a competitor may bid low, resulting in a failed bid by the Contractor, giving no recourse to recover the sunk engineering effort consumed to realise the deliverability of the project. The latter option relies on the Contractor employing underhanded commercial tactics to recover the costs of inevitable delay, resulting in a rampant lack of trust in the construction industry.</p><p>A key challenge is that none of the options available to gain trust and assurance are truly objective, systematic or scalable. This is where intelligent software will eat the world. Just like <a href="https://www.wsj.com/articles/SB10001424053111903480904576512250915629460">how software ate it</a> 25 years ago, the internet did 15 years ago and <a href="https://www.ben-evans.com/benedictevans/2016/12/8/mobile-is-eating-the-world">mobile did</a> 10 years ago. Intelligent software (that which learns and adapts with data) can truly overturn the deadlock with these traits:</p><ul><li>Software can learn from past data to reflect the likely future</li><li>The learning process is objective and reliable; spurious or false data can be detected and removed</li><li>The corpus of knowledge created is virtual, independent and accessible 24/7 by a near infinite number of consumers</li><li>Learning limits are near infinite (as long as there is data available in the world)</li><li>Software remains impartial and humble about what is known and unknown</li><li>The information and insight is accessible and available to scrutiny (in a way that most humans would find personally unacceptable)</li><li>The information presented cannot be altered to tell a different story. It is trustworthy.</li></ul><p>The construction is particularly special and fortunate, thanks to the <a href="https://en.wikipedia.org/wiki/Waterfall_model">waterfall model of planning</a>. For decades, the industry has been measuring what was planned to happen on projects, and more crucially, what actually happened. In the case of nPlan, this becomes our feed source for our algorithms to <em>learn.</em></p><p><em>What does it mean for Contractors?</em></p><p>The availability of intelligent software to Contractors means they now have a scalable method to understand and quantify risk on projects, before that risk materialises into a disaster. We now see Contractors leveraging the insights derived from past data to negotiate with Clients, thereby opening the conversation to reward the Contractor based upon the highly probable outcome of the project. This is fundamentally aligned to the Contractor’s objectives described earlier in the article. It means Contractors only bid on work they can deliver, and that bid has a higher likelihood of being won because it has independent assurance. The work done and delivered to time therefore achieves the target margins, which goes to the bottom line of a Contractor balance sheet.</p><p><em>What does it mean for Clients?</em></p><p>We now see Clients making smarter contracting and procurement decisions. At first, this appears as the bitter truth of what the most realistic delivery of the proposed project will look like, but on second view, this ensures the project’s business case remains valid. Over time, this increases confidence to invest further capital as the risks are known and quantified. Clients can now change the way they engage with Contractors and have a way of understanding risks in proposed work. Intelligent software arbitrates between Clients and Contractors on the most likely outcome and negates subjective opinion.</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*-b9WOzBvSLg22ZhnpMVW8A.png" /></figure><p><em>What does it mean for the construction Industry?</em></p><p>Intelligent software will change some of the fundamentals of the industry, re-aligning them to improve outcomes for all stakeholders. But there is more to this. Using data to systematically quantify risk invites new stakeholders to the industry, namely Insurers and Financiers. These institutions inject capital in exchange for a commercial upside in the trade of risk. Insurers are stepping forward to offer liquidated damages insurance to Contractors, which releases financial burden and increases their competitiveness in the market. Investors are able to make more informed decisions on equity swaps on construction projects. This creates additional liquidity and competition from investors, leading to better terms for Clients, which leads to larger volumes of quality work for Contractors. If you combine these, which is the inclusion of financial institutions to carry risk to enable to core of the industry to operate more productively, we have a vision we can look forward to. It’s one where projects are consistently delivered to time and budget, with all stakeholders benefiting from the built environment.</p><p>To the sceptics reading this, I understand where you are coming from. I was just as sceptical about change, and in my past life I resisted it. Without sounding cliché, this change is different and it’s real. This change works because it operates in favour of all parties exposed to it — everyone is better off.</p><p>When I began my journey with nPlan, I wanted to build something that would break the deadlock I found myself in, as a young Project Manager. I wanted to build something that would change the industry, by creating markets that are based on trust rather than subjective opinions of a few. Seeing these changes coming to life through the work we’re doing at nPlan is deeply exciting and I welcome you to join us.</p><p><em>If you’d like to know more, or would like to share your thoughts and feedback, I’d love to hear it. This story is constantly evolving as we learn more about nPlan’s impact, so stay tuned for updates.</em></p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=277b5ed05ca3" width="1" height="1" alt=""><hr><p><a href="https://medium.com/nplan/business-models-in-the-construction-industry-are-changing-heres-how-277b5ed05ca3">Business models in the construction industry are changing; here’s how</a> was originally published in <a href="https://medium.com/nplan">nPlan</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[How nPlan uses machine learning to solve construction’s biggest problem in 2019]]></title>
            <link>https://medium.com/nplan/how-nplan-uses-machine-learning-to-solve-constructions-biggest-problem-in-2019-b0499d681bf1?source=rss-eb2e897e9aae------2</link>
            <guid isPermaLink="false">https://medium.com/p/b0499d681bf1</guid>
            <category><![CDATA[scheduling]]></category>
            <category><![CDATA[artificial-intelligence]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[planning]]></category>
            <category><![CDATA[machine-learning]]></category>
            <dc:creator><![CDATA[Dev Amratia]]></dc:creator>
            <pubDate>Wed, 02 Jan 2019 14:18:22 GMT</pubDate>
            <atom:updated>2019-01-02T14:18:22.611Z</atom:updated>
            <content:encoded><![CDATA[<figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*vuJ6ClNVAzlVo-e3OzP43Q.jpeg" /></figure><p>The construction industry is in dire and urgent need of improvement. The 10 largest construction companies in the UK made an <a href="https://www.building.co.uk/news/top-10-contractors-under-the-cosh-as-margins-slip-to-less-than-05/5094799.article">average profit of 0.5%</a> over the last reporting year. After Carillion, the next giant is now on the <a href="https://www.bbc.co.uk/news/education-46191830">brink of failure </a>and it is worth stopping to think if we, as citizens who rely upon infrastructure, can afford to let the industry continue down this path. What will it mean for the development of our nations? What will it mean for the utility we have come to expect of our infrastructure?</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*evgJ1g_hZhmUQNLM5EH1oA.jpeg" /></figure><p>Among the many causes behind the performance of the industry, there is one that seems to be common to all parties. Sponsors, Clients, Contractors and Sub-Contractors are unable to systematically understand the risk they carry and, put simply, this risk materialises into wasted time. A delayed construction project has ripple effects in lost productivity, trust and reputation alongside the legal repercussions, financial loss and organisational breakdowns. Stories of CEOs stepping in to firefight a project going off the rails are commonplace and the continual burning of such fires would halt the progress of any organisation.</p><p>Our story at nPlan is centred on improving decision quality by learning from the past. We want to improve the way knowledge is retained and change the industries’ understanding of risk and uncertainty for the better. Over the last 12 months, we have built a software product that quantifies risk and improves certainty in predicting project outcomes. We close 2018 with proof points that our technology works where we demonstrated feasibility on the largest infrastructure project in Europe. We now have 18 partnerships with multinational construction companies, which enables the algorithms to learn from the largest dataset of construction schedules in the world. Without a doubt, teaching an algorithm to <em>automatically</em> <em>understand </em>the historical context of a project purely based on its schedule is a gargantuan technical challenge, which frankly, many have thought to be impossible (more on this in a later blog post).</p><figure><img alt="" src="https://cdn-images-1.medium.com/max/1024/1*VqyjW-FfVgkUnIvnonPIrQ.png" /><figcaption>Simplistic schematic showing the input and output behind nPlan</figcaption></figure><p>Taking our algorithms to the next level will only be done by working with others. Each of the 18 partners we work with have been instrumental to our journey. Our experienced investors have helped and coached us and our research friends at UCL, Harvard and Cambridge Universities support us as we break new ground. We are also very grateful to have been awarded just over £1m in research grants and that<a href="https://www.forbes.com/sites/tiffanyyoung1/2018/11/27/15-machine-learning-companies-to-watch-in-europe/amp/"> Forbes Magazine thinks we are 1 of 15 Machine Learning Companies to Watch in 2019.</a></p><p>The opportunity in front of us is incredibly exciting and is what motivates the team to excel every day. When nPlan delivers insight on project risk, it will do so faster and more accurately than any human has ever been able to. More crucially, the insight we provide removes human biases which plague the construction industry and is able to perform analyses on thousands of projects, simultaneously. These incredibly accurate, rapidly accessed and independent insights allow clients and contractors to understand their risk like never before. This, in turn, will fundamentally change how contracts are negotiated, increasing competition while protecting margins and will work to create a more financially sustainable industry.</p><p>2019 will be a big year for the construction industry as these exciting opportunities begin to play out (with sufficient food, sweat and beers from the nPlan team).</p><p>The exciting part about this technology is that the more data the algorithms see, the more accurate and confident our insights will become. This is very much about the power of the collective, working together to improve outcomes for the industry while respecting the need to maintain privacy and confidentiality. If you’d like to hear more about how the technology works, the benefits it could bring and how you could get involved, please drop me an email and I’d be happy to share more: <a href="mailto:dev@nplan.io">dev@nplan.io</a>.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=b0499d681bf1" width="1" height="1" alt=""><hr><p><a href="https://medium.com/nplan/how-nplan-uses-machine-learning-to-solve-constructions-biggest-problem-in-2019-b0499d681bf1">How nPlan uses machine learning to solve construction’s biggest problem in 2019</a> was originally published in <a href="https://medium.com/nplan">nPlan</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
        <item>
            <title><![CDATA[4 opportunities for AI to improve capital projects and construction.]]></title>
            <link>https://medium.com/nplan/4-opportunities-for-ai-to-improve-capital-projects-and-construction-93e3ed3c4fea?source=rss-eb2e897e9aae------2</link>
            <guid isPermaLink="false">https://medium.com/p/93e3ed3c4fea</guid>
            <category><![CDATA[scheduling]]></category>
            <category><![CDATA[artificial-intelligence]]></category>
            <category><![CDATA[construction]]></category>
            <category><![CDATA[project-management]]></category>
            <category><![CDATA[deep-learning]]></category>
            <dc:creator><![CDATA[Dev Amratia]]></dc:creator>
            <pubDate>Mon, 13 Nov 2017 17:52:28 GMT</pubDate>
            <atom:updated>2017-11-13T17:52:28.118Z</atom:updated>
            <content:encoded><![CDATA[<p>There is a time when all the seemingly random experiences we have in our life and career come together, in one place, to (hopefully) make a difference in our world. That time has arrived for me and I’m writing this to share what I’ve learnt as the CEO of a 6-week old company. With great pride, I’d like to introduce you to <a href="http://nplan.io/">nPlan</a>, the UK’s latest AI startup. It has been 6 weeks since I formally started the company building process but it has probably been about 9 years since I informally started the process.</p><p>For context, I worked for Shell for 9 years, mostly as a Project Engineer on flagship (those worth &gt;$500M) projects around the world.</p><p>I joined<a href="http://joinef.com/"> Entrepreneur First</a> with a view that the way the world executes mega-projects continues to be deeply inefficient, and of course, I’m here to fix it. You’ve probably just rolled your eyes with that and I would have done the same when I began 6 weeks ago. In week 1,<a href="https://www.linkedin.com/in/mattcliffordef/"> Matt Clifford</a> told us that we absolutely had to bake company ambition in early or we’d forever lose the opportunity. The challenge with starting with near limitless ambition is in building laser-sharp focus on the “one thing” to fix, that if solved and scaled to the nth degree, can unlock tremendous value. This is where the value of customer discovery is absolutely critical to get right.</p><p>Building a business involves speaking to potential customers to find out what their problems are, to ensure we build what they want. It helps prevent us from building orbs that nobody wants except its’ creator. Understanding customers is challenging and I struggled to be effective initially, often feeling the need to just tell a potential customer what my idea is, in the hope for validation to escape the awkwardness of being an effective listener. Together with my super talented co-founder,<a href="https://www.linkedin.com/in/nitbix/"> Alan</a>, we spoke to the industry of engineering and construction companies, to discover insight we can address. We met close to 40 people from CEOs to graduates interns and from MPs to academics. Here are four things we learnt and are now passionate to dramatically improve:</p><ol><li>Projects are executed based on the collective brainpower of the project team and a handful of consultants. There isn’t a way to rapidly and seamlessly transfer knowledge within an organisation and as a result, repeated mistakes occur which costs the industry dearly. These costs often manifest themselves as liquidated damages and claims.</li><li>Project estimating and scheduling is often considered an art and not a quantitative science. These art pieces contain flaws in either logic or quantity and as a result, get disregarded much sooner than you’d want.</li><li>Risk is often allocated subjectively to schedules and estimates, which leads to inflated waste. Subjective risk often holds a large range, which means that specific items or targets are shrouded in uncertainty and are undermined because of a low credibility. If the project team doesn’t believe they have a realistic plan, it gets dismissed and overruns become increasingly likely.</li><li>Projects are all different and complex. The existing frameworks to manage size and complexity disconnects management from the work face, by creating layers. At each layer, information is filtered before proceeding upwards, which creates disputable awareness of how a project is actually doing. When things go off plan, two things happen, the first is that it takes forever (~30 days) before the management team learns about the deviation and the second is once discovered, they won’t know how best to react to ensure schedule/cost outcomes are maintained for the overall project. The tendency is to fight the fire, which inevitably allows 2nd or 3rd order critical path items to creep and bite back, resulting in a larger fire.</li></ol><p>These insights have shaped us and we plan on discovering more about them, with the goal of eventually becoming experts in the field. What Alan and I are confident in, as are our first trial customers, is that if we can build a solution that results in a 10x improvement on the points above, it will be huge. <a href="https://machinelearningmastery.com/what-is-deep-learning/">Deep learning</a> on project datasets is the most likely method of cracking this nut open. The good news is that we’ve come to this with the right tools, by asking the right questions. We’re excited about what lies ahead!</p><p>For my next post, I’ll begin to unwrap each of the points above and link how Deep Learning might work to unleash the value we’re all desperately waiting for.</p><p>If you’ve got any questions or thoughts about the above, get in touch on <a href="http://mailto:dev@nplan.io/">dev@nplan.io</a>.</p><img src="https://medium.com/_/stat?event=post.clientViewed&referrerSource=full_rss&postId=93e3ed3c4fea" width="1" height="1" alt=""><hr><p><a href="https://medium.com/nplan/4-opportunities-for-ai-to-improve-capital-projects-and-construction-93e3ed3c4fea">4 opportunities for AI to improve capital projects and construction.</a> was originally published in <a href="https://medium.com/nplan">nPlan</a> on Medium, where people are continuing the conversation by highlighting and responding to this story.</p>]]></content:encoded>
        </item>
    </channel>
</rss>